Typically, standoffs are used for installations on tile, shake, or special thick composition roof types. As a general rule, standoffs should be approximately 2½ inches taller than the cone of the flashing selected for the roof type.

The location of attachment points for standoff mounts depends on the orientation of the modules relative to the rafters. Using the array layout plans and the estimated rafter locations, determine the location of all attachment points and mark the holes for each standoff base.

SnapNrack Standoff Installation:

Remove the tile or shake underneath each standoff location, exposing the roofing underlayment. Transcribe the location marks from the roofing material to the roofing underlayment. Ensure that the standoff base lies flat on the underlayment, but remove no more material than required for the flashing to be installed properly. Use the standoff base as a template to mark lag-bolt hole locations on underlayment above the center of the rafters.

Drill pilot holes

Confirm the location of the rafters by drilling pilot holes into the roof at each of the identified attachment points with a 3/16-inch pilot drill. Be sure to drill the hole deep enough to penetrate the roof decking and enter the rafter by 1 inch to 1½ inch. If the drill pushes through at this point, you have likely missed a rafter and should move ½ inch laterally toward where you estimate the rafter to be and try again.

Secure the base

Prior to securing the base to the roof, insert the 5/16-inch x 1-inch bolt and lock washer through the tapped hole in the standoff base and tighten. Make certain you use the correct part for the type of roof on which you are installing the array. Apply a bead of sealant to the underside of the standoff base and into the pilot hole.

Secure base to the roof by screwing 5/16-inch lag bolts with lag bolt washers into the pilot holes and tightening with a ½-inch socket and socket adapter bit in a power driver. Make sure the lag bolts used are long enough to embed a minimum of 2 inches into the rafter to secure the standoff base to the roof. If the bolt spins out, you didn't hit a rafter. Move ½ inch laterally toward where you estimate the rafter to be and try again starting with a new pilot hole. Most wooden rafters are only 1.625 inches thick, so you should always attempt to hit a wooden rafter in the center if possible.

Attach standoff and install flashing

Screw standoff shaft onto the base and tighten. Install flashing over the standoff shaft and base using standard building practices. Apply a bead of sealant to seal the top of the flashing around the standoff shaft. Slide rubber rain collar over the standoff and press down to cover the sealant at the top of the flashing. Every standoff must be firmly secured to a rafter to ensure system integrity. Make sure that all lag screws are securely tightened into roof rafters and are structurally sound.

Flashings not included




GoGreenSolar Customer

Why Choose Us?

We are America's leading experts in residential home solar kits. In addition to guaranteed lowest pricing on solar panels, inverters, and racking, we'll help you every step of the way including sizing your system, designing your panel layout, permitting, and interconnection.

Shop with confidence knowing you'll receive free technical support from beginning to end until your system is powered up and you're generating free energy from the sun!

Call (866) 798-4435 for Expert Help
First Name *
Last Name *
Email *
Phone *
Zip *
How can we help you? *


We respect your privacy and your information will not be shared.

Related Products